Timetable information
Weekday departures: 43/day · Sat & holiday departures: 43/day
First / last departure (weekday): 5:07 / 22:46
Busiest hour: 6:00–7:00 (4)
0:00 ─ 23:00
Figures are typical departures in the timetable data, not a live service count.
Timetable data as of 2 May 2026.
Adjacent stations
- Nishikigawa Seiryu Line: Seiryu-Shin-Iwakuni
- Gantoku Line: Nishi Iwakuni ⇄ Hashirano
Location
History
Kawanishi opened on 16 April 1960 as an infill stop on the JNR Gantoku Line between Nishi-Iwakuni and Hashirano, accepting only diesel-railcar passengers and unstaffed from the start. It became a nominal branch terminus on 1 November the same year when the JNR Gannichi Line opened as far as Kawayama. Around autumn 1977 the platform was extended in both directions following a local petition, allowing the previously-passing-through 10-car loco-hauled passenger trains to stop here. The station passed to JR West at privatisation on 1 April 1987, and on 25 July 1987 the Gannichi Line was transferred to Nishikigawa Railway, making the stop a joint JR West/Nishikigawa station.
Notes
Kawanishi is the operational starting point of the Nishikigawa Seiryū Line — a 0-km post sits on the platform — but the physical junction with the JR Gantoku Line is 1.9 km further on at Morigahara Signal Box. The two operators share that 1.9 km section as joint Class-1 rail businesses, and every Nishikigawa Seiryū Line train runs through onto JR tracks to Iwakuni: JR fares apply on the Iwakuni–Kawanishi section even on Nishikigawa Railway rolling stock.
Sources
- Wikipedia (English) (opens in a new tab)
- Wikipedia (日本語) (opens in a new tab)
- Photo: そらみみ · CC BY-SA 4.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)
Last updated: 2026-05-22