Timetable information
Departure data for this station is not available on this site.
Location
History
Nishi-Shibata Station in Shibata, Niigata Prefecture opened on 1 April 1957 (some sources give 11 February 1957) as an unstaffed stop on what is now JR East's Hakushin Line. It came under JR East with the privatisation of Japanese National Railways on 1 April 1987. For decades the station had only a single track with no passing loop, a major operational constraint; in October 2000 JR East and Shibata City jointly funded an approximately 800 million yen project that moved the station 200 metres toward Shibata and added a second track. Suica became available on 21 January 2006.
Sources
- Wikipedia (English) (opens in a new tab)
- Wikipedia (日本語) (opens in a new tab)
- Photo: Mister0124 · CC BY-SA 4.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)
Last updated: 2026-05-18