Station

Kawahigashi (Fukushima)

川東

View on the live map →

Kawahigashi (Fukushima)
Photo: Mister0124 · CC BY-SA 4.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)

Timetable information

Departure data for this station is not available on this site.

Location

History

Kawahigashi Station opened on 30 October 1931 as the terminus of the Suigun North Line (Suigun-Hokusen). It became a through station on 4 December 1934 when the Suigun Line was completed by linking Iwaki-Tanagura and Kawahigashi. CTC introduction in 1983 left it unstaffed save for a volunteer-run simple-commission ticket office; the station passed to JR East on 1 April 1987. The disused second track was closed on 26 October 2014, the old station building was demolished in December 2019, and a new station building opened on 24 March 2020.

Notes

The station's rebuilt toilet, completed in 2018, was given a design evoking a traditional storehouse (kura); the station building itself was renewed in 2020.

Sources